← All fleet GPUs

RTX 3080 Ti for rent on Vast.ai

1 card in the Vast Sale fleet, 12 GB. Live figures refresh hourly from the Vast dashboard.

30 days
$99
income per card
Host rate
$0.16
per hour, per card
Busy now
1/1
cards rented
Payback
4.6
months, card only

12 GB, previous generation. The rate is several times lower than the 40 and 50 series, but so is the second-hand price, which keeps the payback period comparable. Rented out since 2 April 2026.

Per-card economics

Income, last 30 days (26.10–25.11)$99
Income, last 24 hours$3.42
Electricity per month at $0.06/kWh$12.14
Card price, second-hand reference$400
Card payback at the last 30 days of income4.6 mo
Host rate / client price, per hour$0.160 / $0.213
Reliability per Vast99.84%

Electricity follows the 2026 mining study, the card price comes from the calculator, where you can enter your own tariff, utilization and price.

2026: renting or mining

One card from 1 January to 4 November, 308 days. Renting uses Vast payouts from 2026-04-02 and an estimate before that (30% of revenue). Mining takes the most profitable coin of each day, sold immediately.

Renting, net$767
Mining, net$665
Electricity over 308 days$123
TFLOPS per Vast44
Pearl (PRL), TH/s128
Power while mining, W211
Average mining revenue per day$2.62

Full study: mining vs renting in 2026

Machine configuration

1× RTX 3080 Ti
CPUAMD Ryzen 9 7900X3D 12-Core Processor, 24 threads
RAM31 GB
MotherboardB650E PG Riptide WiFi
PCIePCIE 4.0, 16x, 25.6 GB/s
DiskSamsung SSD 990 PRO 2TB, 4785 MB/s
Network, Mbps↑641 ↓551
Max CUDA13.2

All machines in real time are on the fleet page. Build considerations: hardware, power, internet.

Other GPUs in the fleet

GPU30 days, per cardRate, $/hPayback, mo
RTX 5090$432$0.656.0
RTX 4090$266$0.458.7
RTX 5080$192$0.255.6
RTX 3080$99$0.143.7
RTX 2060 SUPER$46$0.103.4

Need help with the move?

Turnkey setup with a launch guarantee.

View services