RTX 2060 SUPER for rent on Vast.ai
1 card in the Vast Sale fleet, 8 GB. Live figures refresh hourly from the Vast dashboard.
8 GB and 9 TFLOPS, the weakest card in the fleet. It only went up for rent on 15 October 2026, so almost all of its 2026 figure is an estimate.
Idle time on a card like this can be filled with background mining through Vast's defjob: setup walkthrough.
Per-card economics
| Income, last 30 days (26.10–25.11) | $46 |
| Income, last 24 hours | $1.89 |
| Electricity per month at $0.06/kWh | $7.90 |
| Card price, second-hand reference | $130 |
| Card payback at the last 30 days of income | 3.4 mo |
| Host rate / client price, per hour | $0.100 / $0.133 |
| Reliability per Vast | 99.54% |
Electricity follows the 2026 mining study, the card price comes from the calculator, where you can enter your own tariff, utilization and price.
2026: renting or mining
One card from 1 January to 4 November, 308 days. Renting uses Vast payouts from 2026-10-15 and an estimate before that (93% of revenue). Mining takes the most profitable coin of each day, sold immediately.
| Renting, net | $201 |
| Mining, net | $171 |
| Electricity over 308 days | $80 |
| TFLOPS per Vast | 9 |
| Pearl (PRL), TH/s | 41 |
| Power while mining, W | 119 |
| Average mining revenue per day | $0.81 |
Full study: mining vs renting in 2026
Machine configuration
| 1× RTX 2060S | |
|---|---|
| CPU | AMD Ryzen 5 3600 6-Core Processor, 12 threads |
| RAM | 32 GB |
| Motherboard | B450-A PRO MAX |
| PCIe | PCIE 3.0, 16x, 12.5 GB/s |
| Disk | Samsung SSD 980 PRO 500GB, 1528 MB/s |
| Network, Mbps | ↑619 ↓707 |
| Max CUDA | 13.3 |
All machines in real time are on the fleet page. Build considerations: hardware, power, internet.
Other GPUs in the fleet
| GPU | 30 days, per card | Rate, $/h | Payback, mo |
|---|---|---|---|
| RTX 5090 | $432 | $0.65 | 6.0 |
| RTX 4090 | $266 | $0.45 | 8.7 |
| RTX 5080 | $192 | $0.25 | 5.6 |
| RTX 3080 Ti | $99 | $0.16 | 4.6 |
| RTX 3080 | $99 | $0.14 | 3.7 |